M24
Under Construction
Scope
- Formwork S/I
- Reinforcement installation
- Concrete Pump/place/finish
- Groundworks – 7000m2 soffit formwork
- In situ lift/stair core walls
- 92 columns
- 3500m3 concrete
SOUTHBANK
Complete – November 2016
Scope
- Formwork S/I
- Concrete place/finish
- Groundworks
- 3750m2 of soffit formwork
- 210 m2 single sided walls
PINNACLE APARTMENTS
Under Construction
Scope
- Concrete place/finish
- (Basement – L2 only)
- 1200m3 raft pour
SUBLIME
Complete – 2015
Scope
- Formwork S/I
- Concrete Pump/place/finish
- Reinforcing Installation
- Groundworks
- 3,000m2 soffit formwork
- 1000m3 in situ concrete
95 BELGRAVIA STREET
Complete – 2015
Scope
- Formwork S/I
- Bubble deck Installation
- Concrete Pump/place/finish
- Reinforcing Installation
- Groundworks
- 4,500m2 falsework
- 4,500m2 bubble deck installation
- 3 x in situ concrete lift/stair cores
- 1800m3 in situ concrete
999 HAY STREET
Complete – 2015
Scope
- Concrete place/finish
- 15,000m2 of floor area Bubbledeck
- 11 Storey side core building
LAKESIDE SHOPPING CENTRE - JOONDALUP
Complete – 2015
Scope
- Concrete place and finish
- 2000m2 Aldi floor with 3mm tolerances
- SP4/5/6, 30 + 500m3 concrete pours
ZIMBULUS FOOD PROCESSING PLANT
Complete – 2015
Scope
- Formwork S/I
- Concrete Pump/place/finish
- Reinforcing Installation
- Groundworks
- 12,000m2 of Concrete Factory flooring with 3mm tolerances
- 4,500m2 Concrete Hardstand
- 3,500m2 of Tilt-up panels
- 1500m2 of Delta core suspended slabs